M/V Carpathia of AHRENKIEL STEAMSHIP
Source:    Publish Time: 2018-12-17 14:29   606 Views   Size:  16px  14px  12px


The 67th vessel that ANS completed in 2018. During 28days of her docking in COSCO Guangzhou,the main projects we completed:

-Steering gear hydraulic pump overhaul service(Including disconnect/remove,fit back to vessel and install)

-ACB for main generators ,emergency generator and bow thruster to be calibration and issue certificate

-NO.1&NO.2 A/E overhaul and maintenance service

-Main generators sensors cable to the local junction box renew service.

-Main engine sensors cable to the local junction box renew service.

-NO.1 A/E T/C overhaul and maintenance service

-Mooring winch overhaul and replace new hydraulic motor, brake disc and hydraulic block.

-Supply spare parts(hydraulic valve,pressure transmitter ect...)